How to use this guide
By the KC Barndominium Builders Team. Updated September 19, 2026. This is planning guidance and original source synthesis, not a parcel approval, project estimate or engineered design. Use the questions with the professionals responsible for your particular build.
Start with the parcel and intended uses
Identify the controlling jurisdiction and describe living space, shop activities and any future dwelling. Ask which zoning review is required before building-plan review. Johnson County’s building division serves unincorporated areas; its requirements are not automatically the rules in a city within the county.
Establish a feasible site plan
Place the proposed structure, access, utilities and wastewater on the site information requested by the authority. Resolve the responsible offices for drainage, road entrance and environmental review. Building approval does not necessarily replace those separate reviews. Keep each prerequisite and decision in a tracking sheet.
Coordinate shell, foundation and residential systems
Ask the supplier exactly what its engineering package covers. Foundation reactions, anchorage and openings must coordinate with the building system; residential plans also need the applicable room, system and energy details. Do not assume every project requires an identical set of professional seals. Obtain the jurisdiction’s requirements and have the appropriate designer provide the required work.
Submit a consistent drawing revision
Include the documents on the authority’s current checklist and name one person to answer review comments. A change to an opening or building size can affect several sheets. Record approved revisions and distribute them to suppliers and trades so an old shop drawing does not become the construction instruction.
- Track each reviewer’s comment and its resolution
- Distinguish preliminary approval from an issued permit
- Confirm separate trade permits and responsible applicants
- Ask whether changes require resubmittal before installation
Plan inspections before work is concealed
Ask the building department for the inspection sequence and notice requirements. Coordinate foundation and underground work before concrete and required rough inspections before closing walls. If a correction is required, document it and obtain the required reinspection rather than covering it because a following trade is scheduled.
Close out the dwelling, not just the shell
Confirm the authority’s requirements for occupancy and the lender’s completion requirements separately. Assemble approvals, final drawings, equipment instructions and warranty contacts. An erector’s completion invoice does not establish that the home can be occupied. If phased completion is intended, obtain the proposed phase boundaries and required systems in writing.
Additional jurisdiction resources
Use the authority responsible for your parcel; neighboring jurisdictions can have different requirements.